top of page

RENOVATION OF AN APARTMENT IN PARIS

RENOVATION APPARTEMENT 1
RENOVATION APPARTEMENT 2
RENOVATION APPARTEMENT 3
RENOVATION APPARTEMENT 5
RENOVATION APPARTEMENT 6
RENOVATION APPARTEMENT 14
RENOVATION APPARTEMENT 15
RENOVATION APPARTEMENT 16
RENOVATION APPARTEMENT 9
RENOVATION APPARTEMENT 10
RENOVATION APPARTEMENT 11
RENOVATION APPARTEMENT 12
RENOVATION APPARTEMENT 13
RENOVATION APPARTEMENT 18
RENOVATION APPARTEMENT 19
RENOVATION APPARTEMENT 20
RENOVATION APPARTEMENT 21
RENOVATION APPARTEMENT 22
RENOVATION APPARTEMENT 32
RENOVATION APPARTEMENT 33
RENOVATION APPARTEMENT 34
RENOVATION APPARTEMENT 35
RENOVATION APPARTEMENT 36
RENOVATION APPARTEMENT 23
RENOVATION APPARTEMENT 26
RENOVATION APPARTEMENT 27
RENOVATION APPARTEMENT 24
RENOVATION APPARTEMENT 25
RENOVATION APPARTEMENT 30
RENOVATION APPARTEMENT 29
RENOVATION APPARTEMENT 37
RENOVATION APPARTEMENT 38
RENOVATION APPARTEMENT 7
RENOVATION APPARTEMENT 8

Total renovation  of an old 2-room apartment

Price of works per m²: 1110 €

RESTRUCTURING OF VOLUMES

In this apartment  intended for rental, the volumes have been modified to obtain a kitchen open to the living room. 

The partition which initially separated the living room, the kitchen, the hallway and the entrance has been demolished.

The new space created provides more luminosity and the open kitchen brings a more contemporary touch.

 

KITCHEN RENOVATION 

A completely renovated kitchen. Les éléments de cuisine vétustes ont été remplacés par une cuisine équipée et totalement intégrée. Due to space constraints,  IKEA kitchen units have been resized and adapted to accommodate  all necessary equipment: induction hob, extractor hood extractor, oven, microwave oven, fridge-freezer, dishwasher.

In the credenza of the work plan, laying of "metro" tiles, on the ground  laying of tiles looking like cement tiles.

BATHROOM RENOVATION 

The ageless bathroom  has been completely renovated and brought up to date. The bathtub has been replaced by a shower tray of dimension comfortable of 80 x 140 cm with glass door sliding, installation of a cotemporary washbasin cabinet and suspended toilet. The bathroom is now heated by a towel radiator. A  horizontal water heater of 150 L  was concealed against the top in a removable formwork with an inspection hatch. The floor and wall tiles are porcelain stoneware.

RENOVATION AND INSTALLATION OF WINDOW 

The new kitchen project did not allow the existing window to be kept due to a work plan abutting de l'ouverture. The window  was therefore replaced  by a PVC model with low-emissivity 4/20/4 insulating glazing consisting of 2 openings at the_cc781905-5cde-3194-bb3b- 136bad5cf58d_francaise on fixed sill, including un oscillo-battant.

 

09 53 22 07 05

To estimate  the cost of renovation  of your apartment:

 

contact us

Abatec rénovation : entreprise de renovation écologique rge à paris
Abatec renovation : société de rénovation immobilière certifiée rge qualibat
bottom of page